This page showcases our Past project work in Power and ICT, highlighting the electrical installations, network solutions, and infrastructure systems we have successfully completed for various clients.
Our technician carrying out scheduled generator servicing. The generator size is 20 kVA Catapillar.
Tower SACCO Society Ltd project for supply and installation of a new AKSA Diesel Generator.
400A Main Breaker Installation
400A Main Breaker Installation in the main power room.
Completed installation of 36 JA Solar panels, solar structure and hybrid inverter at Amboseli National Park.
Solar Panel Installation in Amboseli National Park
Solar Panel Installation in Amboseli National Park
Completed installation of 36 JA Solar panels, solar structure and hybrid inverter at Amboseli National Park.
Completed installation of 36 JA Solar panels, solar structure and hybrid inverter at Amboseli National Park.
Solarization of borehole using 10 kW solar panels and 7.5 kW hybrid inverter for WWF funded project.
OTDR Testing using Viavi MTS4000. The fibre cable installed is 48 core GYTY passing underground.
A domestic installation of 3 kVA TBB RiiO Sun II Hybrid Inverter and 5 kVA Megatank battery for providing uninterrupted power backup.
Digging of 1 foot trench and laying of 4 inch PVC duct for running power cables from Main Power Room to a building.
Power backup project. Electricians installing new power cables to connect inverter backup power to classroom teaching equipment.
Cutout isolation outside a building to allow for new cable and DB installation.
Our Electricians installing inverter battery backup and new power cables for a server room during shutdown.
Installation of power cable in a server room.
Technicians installing inverter battery backup and new power cables for a server room during shutdown.
Installation of underground cable 70 sq.mm. 4 core armoured to replace existing faulty cable from the main power room to Admin Block of a university.
Laying of 70 sq.mm. 4 core armoured to replace existing faulty cable from the main power room to Library Block of a university.
Use of clamp metre to measure voltage and current after new circuit breakers and electrical cables were installed.
Power factor correction capacitor banks being installed in a university main power room to reduce reactive load and hence reduce power bills.
A technician terminating power cables in an existing distribution board. The power cables were suppling backup power to classroom teaching tools in a university.
Mounting of Victron Quattro 10KVA, 10 kWh batteries and accessories.
Manhole for providing access to undergroung power and network cables that interconnect two building blocks.
Technician taking busbar measurements to ensure they meet the requirements for new 400A main breakers installed.
Setting up the bypass panel for KPLC and AVR. The bypass is rated 600A 415V.
Technicians setting up the bypass panel for KPLC and AVR. The bypass is rated 600A 415V.
Additional view of technicians installing the bypass panel for KPLC and AVR. The bypass is rated 600A 415V.
Termination of cable lugs on a 240mm aluminium cable 4 core. The cable will be connected to the main breaker installed on the wall.
Taking busbar measurements to ensure they meet the requirements for new 400A main breakers installed.
Setting up the bypass panel for KPLC and AVR. The bypass is rated 600A 415V.
Our Technicians installing main breaker panel, rerouting and termination of cable to the panel.
Complete installation of 100 kVAR Power Factor Correction bank, 415V 600A Bypass panel, 410 kVA IREM AVR , 600A Main Incomer and 600A AVR Isolator. This was an upgrade that we did for power stability project in an institution.
Complete installation of 410 kVA IREM AVR. This was an upgrade that we did for power stability project.
Technicians installing an Easy 3S 30 kVA UPS in a building to provide power to workstations and telecommunications.
Structured cabling work. Vertical powder coated mettalic 2 compartment trunking connecting power and ethernet cables from the ceiling void to desk workstations.
Power and network setup in a new office. Power and ethernet cables are sunning from the source to the desk points through the ceiling void and vertical trunking.